NVIDIA A100 40GB PCIe rental price
Median $1.15/GPU-hr on-demand · $0.46/GPU-hr spot · across 3 providers · Updated 2026-08-11 04:38 UTC · Anatomy ↓
Price history
Each point is the daily cross-provider median for this SKU and pricing type (per-provider medians first, so no marketplace’s volume dominates). Gaps are gaps — we don’t interpolate missing data.
Dashed/hollow points before 2026-08-09: archival reconstruction from dated provider pricing-page snapshots (see methodology) — fewer providers, monthly resolution.
The spread: the same NVIDIA A100 40GB PCIe ranges from $0.64 to $1.99 per hour across tracked providers right now — a 3.1× difference. This is why we exist.
Where to rent it
| Provider | Type | Region | $/GPU-hr | Seen |
|---|---|---|---|---|
| Spot | JP | $0.46 | 2026-08-11 03:29 UTC | |
| On-demand | EE | $0.64 | 2026-08-11 03:29 UTC | |
| On-demand | — | $1.15 | 2026-08-11 04:38 UTC | |
| On-demand | — | $1.99 | 2026-08-11 04:38 UTC |
Prices are as listed by providers at scrape time; availability at a listed price isn’t guaranteed. Links marked ↗ may be affiliate links — they never affect prices shown or ordering.
Anatomy: why it costs this
Everything that has to exist before one A100 40GB PCIe-hour can be rented — then the arithmetic on the parts that can be priced honestly.
Power basis: vendor GPU TDP only — full-server draw runs meaningfully higher × PUE 1.54 × 8.71¢/kWh (0.39 kWh from the grid). Water bounded at 1.8 L/kWh and $5/m³ — deliberately high. The residual is hardware amortization, facility, staff, and margin — presented as a residual because vendors don’t publish server street prices, and we don’t print numbers we can’t stand behind.
Verified inputs & sources
- NVIDIA A100 40GB PCIe power basis: 0.25 kW — NVIDIA specifications
- US industrial electricity, average retail: 0.0871 $/kWh — EIA Electric Power Monthly (May 2026, preliminary) (checked 2026-08-10)
- Industry average PUE: 1.54 × — Uptime Institute Global Survey 2025 (weighted avg; ~flat six years) (checked 2026-08-10)
- Best-in-class fleet PUE (Google, 2025): 1.09 × — Google data center efficiency (2025 fleet average) (checked 2026-08-10)
- Water usage effectiveness, evaporative-cooling upper range: 1.8 L/kWh — Operator-reported WUE ranges (~0.2 hyperscaler best → ~1.8 evaporative) (checked 2026-08-10)
- Industrial water price, generous upper bound: 5 $/m³ — Upper-bound assumption (US industrial rates are typically well below this) (checked 2026-08-10)
- Reference context with the arithmetic shown — never fed into the Index or any published series (see methodology).
One email when the NVIDIA A100 40GB PCIe daily median hits your number. No account, one-shot, the alert retires after it fires.
Last scrape: 2026-08-11 04:38 UTC · 1494 observations today across 16 providers · Failures logged, never interpolated.
Know what a GPU-hour costs before everyone else does.